a contractor estimates that he can paint a house in 5 days using 6 men. if he actually uses 5 men for the job, how many days will they take to paint the house?

Respuesta :

Einstein08 Einstein08
  • 01-09-2018
it will take 4 days to paint the house with 5 men
Answer Link
tramserran
tramserran tramserran
  • 01-09-2018

1 house = 6 men x 5 days  = 30 man days

Need 30 man days with only 5 men: 30x = 5 men   →  x = 6

It will take 6 days for 5 men to complete the job.

Answer: 6 days


Answer Link

Otras preguntas

How do group IQ tests administered to students create a self-fulfilling prophecy?
Solve the equation below
100in less or greater than 3yd 1ft
31/6 as a mixed number
Which statement is true about a cell wall but not a cell membrane
I need help on 13-26 please
Bones act as a frame to which _____ are attached for movement. cartilage organs striated muscles cardiac muscles
A word used to describe a non-active volcano
A body moving with a velocity of 20 m/s begins to accelerate at 3 m/s2. How far does the body move in 5 seconds? A. 137.5 m B. 196 m C. 260 m D. 162.5 m
Write an equation for the area of a rectangle that is three times as long as it is wide. Use only one variable.