JaymezMerfy1002 JaymezMerfy1002
  • 01-10-2018
  • Computers and Technology
contestada

Which term describes the complexity of a document

Respuesta :

narstarolor
narstarolor narstarolor
  • 06-11-2020

Answer:

Work breakdown structure (WbS)

Explanation:

A work-breakdown structure in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections, and also defines its complexity.

Please let me know if this helped

Answer Link

Otras preguntas

solve the system of equations y=4x+1, y=x2+2x-2
Check that x=2 and y=5 is a solution of both equations below: X+2y=12 3x+6y=36 *
the quotient of a number and 3 is 8
The Scale on a map shows that 200 is represented by 5 inches on a map .Which proportion can be used to find the distance on the map x, that represents 50 miles?
.The Lithosphere is another name used for one of the earth systems. Name this system!
Placker Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermi
An angle in standard position has a terminal side that passes through (-1, -1). Choose all of the functions that will be negative for the angle. tan csc sin se
Sarah rolls 2 fair dice and adds the results from each. Work out the probability of getting a total less than 2.
cos 60° = 1/2 and sin 60º SQT 3/2 True or false
write a story pleasee marking brainiest!