liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

I NEED HELP PLEASE!! PLEASE IM BEGGING YOU!!
Which is an example of gathering primary data? preparing a database reviewing a historical report performing an Internet search conducting a survey
A bottle of water contains 450ml. How many litres of water are there in 8 of these bottles
A window cleaner rises 36 feet up the side of a building, then descends 17 feet. What is his final position?
It's My Life By: Jon Bon Jovi What does the simile in the chorus means?
Branliest! Please I'm beggin you! Help me!!!The lunch lady has 5 pounds of lasagna left over. If she makes 14-pound servings, how many servings of lasagna can s
List the Seven life saving steps in the order you should check an injured person
Explain how mixture melting points can be helpful in distinguishing between two compounds that have essentially the same melting point.
This site isn't exactly for talking but whatever. Are you against or for transgender identities, and why? I'd love to have a civil chat no matter your opinions.
(4, 2); slope = 3 please help!!!!