A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

A patio at the front of the school is a quadrilateral with 4 right angles and 4 congruent sides. What type of quadrilateral is it?
Which statement about the geography of Japan is most accurate? Location has made it easy to invade. The irregular coastline has many natural harbors.
Which of the following statements is an accurate description of vibrations? A. Neither ultrasonic nor infrasonic vibrations can be heard by humans
which form of energy is observed when an athlete runs
Rilke referred to his poems as “_____ poems.”
Amino acids that you obtain from eating foods are classified as a. extracellular. b. essential. c. facilitated. d. inorganic.
Find f. A) 7.4 B) 8.2 C) 10.5 D) 11.1
An example of a core value of the United States culture would be the ______________. desire to accumulate wealth focus on population control dignity of the elde
Energy is measured in watts and work is measured in joules. true or false?
What is definition of 'order' ?