medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

What is the first step needed to solve 2/5 x -6= -16 ? Subtract 16 from both sides Add 6 to both sides Divide both sides by 5 Multiply both sides by 2
The 2010 Mw 7.0 earthquake in Haiti caused an estimated 280,000 structures to collapse or sustain severe damage and resulted in the deaths of 100,000 to 160,000
Schools do not help maintain control in society True or false
When India was still divided into a number of Muslim and Hindu kingdoms, the Moguls conquered it. True False
PLEASE HELP!!!!!! WILL GIVE BRAINLYEST!!!!!!! in your own words....What did you learn about civic action?
An ecosystem ________. Select one: a. is a regional grouping of plants, animals, and other biotic factors b. is the total population of a specific kind of plant
The first step of added-value negotiation is:A. identify options.B. perfect the deal.C. design alternative deal packages.D. clarify interests.E. select a deal.
What does a cell’s surface area to volume ratio effect
How did the American dream change throughout the 20th century?
HELP!!! I NEED AN ANSWER SOON!!!!! FIRST TO ANSWER WILL GET BRAINLIEST!!!!!!!!!!! THANKS IN ADVANCE!!!!!!!!!