leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

Is square -64 an integer,irrational,ot a rational number PLEASE HELP ME ASAP!!!
Wastewater from a cement factory contains 0.410 g of Ca2+ ion and 0.0330 g of Mg2+ ion per 100.0 L of solution. The solution density is 1.001 g/mL. Calculate th
10z = 8z + 42 0/1 pt
The average hourly wage of workers at a fast food restaurant is $6.50/hr with a standard deviation of $0.45. Assume that the distribution is normally distribute
A partridge of mass 4.90 kg is suspended from a pear tree by an ideal spring of negligible mass. When the partridge is pulled down 0.100 m below its equilibrium
Evaluate 5(14 – 23) + 8 ÷ 2. A. 26 B. 34 C. 44 D. 56
The capacity of a small children's swimming pool is 105 gallons of water. There are currently 15 gallons of water in the pool. You are filling the pool with wat
Research Maya Angelou and write about why she wrote the poem, “I Know Why the Caged Bird Sings.” Make sure to include what happened in her life to make her feel
____________ is an example of the concept of feedback is a factory information system that is programmed to alert the manager if there is any decrease in produc
Jayden has 10 pound bag of flour. He needs to separate the flour into3/5 pound bags. How many bags can he make explain your reasoning