Renabelle7323 Renabelle7323
  • 04-02-2022
  • Computers and Technology
contestada

True or false: Concurrent validation is more time consuming to measure than predictive validation because it involves a wait period. Group of answer choices

Respuesta :

jimbok2020
jimbok2020 jimbok2020
  • 04-02-2022

This is false, I hope this helps you with your task

Answer Link

Otras preguntas

Which city is closest to the International Date Line? City Latitude Cape Town, South Africa Pontianak, Indonesia Nome, Alaska Quito, Ecuador Stockholm, Sweden W
1.- Make a program that loops and perform powers of 5 on each loop. In each lap the operator is asked IF YOU WISH TO CONTINUE (1 or 0) if the operator enters a
PLS HELP THANK YOU I REALLY NEED IT
Mario is setting up a new tent during a camping trip. The tent came with 7 feet of rope. The instructions are to use 34.5 inches of the rope to tie a tarp on to
I would like you _____ go _____the library _____ check out _____books each. I am going ____go _____, but I am going _____check out three, rather than____. Next
Give two examples from Mikael Gorbachev's speech of the weakness of the Soviet Union in the years before it fell.
A bottle holds 5 55 milliliters of perfume. How many bottles can we fill with 2 22 milliliters of perfume?
Help please Read the excerpt from a creative nonfiction assignment. The dog trotted behind me as I hiked through the woods. A dog is a loyal companion, I thoug
Which of the following is the graph of y= e^x + 1?
The layer of the ISO/OSI responsible for source to destination delivery.Options:(a) transport(b) network(c) data-link(d) session ​