mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

How long does it take to clear the alcohol from your blood from one drink (12 oz) of beer? 1 hour 1.5 hours Depends on the person
the equations of two functions are y equals -21x + 9 + y equals -24x + 8 which function is changing more quickly and why?
How is 4 3/11 written as a decimal
In rwanda, a farmer is hiding a group of persecuted tutsis from a hutu military commander. the farmer believes that he has to always tell the truth, and that th
MY DUDE I NEED HELPPP
The table shows a linear function. Which equation represents the function? f(x)=−2x+4 f(x)=2x+12 f(x)=−12x+4 f(x)=4x−2 x f(x) 4 2 0 4 −4 6
Sabrás más después de que ___________ el anuncio clasificado. A. contestarás B. contestes C. contestas D. contesten
An institution unique to the house of representatives that reviews all bills (except revenue, budget, and appropriations bills) coming from a house committee be
On a recent trip to the convenience​ store, you picked up 3 gallons of​ milk, 5 bottles of​ water, and 5 ​snack-size bags of chips. your total bill​ (before tax
B. X(3,2) L(2,5) W(4,4) C.X(0,-3) L(-1,0) W(1,-1) D.X(-1,1) L(0,2) W(2,0) Geometry math question