henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

Cuando regresemos de espana,_ en una campania aerea diferente.(venir) In Future tense
Why was the election of 2008 notable? A. Its electoral results were widely disputed. B. It led to the defeat of incumbent George W. Bush. C. It ended with the e
What kind of water pollution is it intended to prevent?
What is the area of the figure below?
What factors lend credibility to the article?
What is the length of segment AB? (1 point)
a 20kg ball is rolling at a speed of km/s. how much is the kinetic energy?
You get into an argument with your classmate about whether ATP hydrolysis is required for actin polymerization. You argue that ATP hydrolysis is not required, b
Try it What is the vertex of the quadratic function f(x) = (x – 6)(x + 2)?
Becky is making a necklace using blue beads and black beads. Complete the ratio table to find the number of blue beads she adds when she uses 12 black beads. Nu