Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

Which document explained the reasons why the Trustees decided to settle the colony of Georgia? ​
HELP HURRY NOW ASAP!!
What does Gregor believe will happen when he gets out of bed?
How does what happen in politics and in the government affect you as an individual and in your everyday life ?
For her school Science Fair, Alyssa designs an experiment to learn more about erosion. Her experimental set up is shown below. What is the INDEPENDENT VARIABLE?
If n is the larger of the two consecutive numbers, write an expression for the sum of these two numbers.
Solutions with a pH above 7* is a neutral solution has a high concentration of hydrogen ions has a low concentration of hydroxide ions has a high concentration
What is the author’s tone of the poem?
true or false electromagnetic radiation comes from extraterrestrial sources like the sun and distant stars and galaxies​
Which two foods are most like homogeneous mixtures? A. Tossed Salad B. Trail mix C. Mayonnaise D. Mustard