aliyucivil1982 aliyucivil1982
  • 04-08-2019
  • Engineering
contestada

Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

Dropping less than two inches per mile after emerging from the​ mountains, a river drains into the ocean. One​ day's discharge at its​ mouth, 9.6 trillion​ gall
How does the frame story structure create tension in ambush
Which of these is an example of haploid cell? Sexually Asexually vegetatively
Why is it more important to monitor your word choice in a professional environment
A 26-year-old client who abuses heroin states to the nurse, "i have been using more heroin lately. i told my provider about it and they said i need more and mor
Use instantaneous speed to find instantaneous velocity
k/2-6=28 solve for k show work please
What are the next two numbers in this pattern? 5, â30, 180, â1080, . . ?
At rite aid, you can buy 5bags of skittles for $5.25. At Duane trade, you can buy 4 bags of skittles for $5.00. At CVS, you can buy 10 bags of skittles for $9.0
How do air temperatures and air pressure change in the summer season?