matttmoney1221 matttmoney1221
  • 02-06-2016
  • Business
contestada

​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

If 2 less than or equal too X less than or equal too 6, which of the following has the greatest value
other name for blood
What is the lateral area of the rectangular prism? Assume the prism is resting on its base. A. 135 in2 B. 270 in2 C. 300 in2 D. 310 in2
The entire region of Northern Africa and southwest Asia has a climate generally described as?
Buck drove 220 miles in 5 hours. What was his average rate of speed?
A 4.5 newton object is placed in a tank of water. If the water exerts a force of 4.0 newtons on the object, will the object sink or float?
The circumference of a circle is 6.28.What is the area of the circle?
Which of the following rivers is the world's busiest waterway ?
Horace read 160 pages in 4 hours. How many pages can he read in 6 hours??
The plans for a shed call for a rectangular floor with a perimeter of 204 ft. The length is two times the width. Find the length and width.