In producing product AA, 6,300 pounds of direct materials were used at a cost of $1.10 per pound. The standard was 6,000 pounds at $1.00 per pound. The direct materials quantity variance is:

Respuesta :

amanarsalan
amanarsalan amanarsalan
  • 16-12-2019

Answer:

300 A

Explanation:

(SQ - AQ) SP

(6000 - 6300)1

300 A

It means that actual quantity produced is worse than expected quantity.

Answer Link

Otras preguntas

Where does all of the energy in an ecosystem ultimately come from? Please help
What are two numbers that add up to 70 without regrouping?
F=3gh+7c solve for g
Divide 33 photos into two groups so the ratio is 4:7. How do you properly write the answer? 4 7 4 7 4 7 4+4+4=12 7+7+7=21 12+21=33 Is th
If the diameter of a circle is 5.5 cm what is the radius ?
36 is what percent less than 48?
Tell whether the set is closed under the operation indicated.If not closed, provide a counterexample.1.) integers under addition                            2.)
describe 2 ways you could evaluate 37% of the sum of 27 3/5 and 15/9
plrase help a little stuck here
Chiang picked 12 apples. She gave 1/6 of the apples to each of her 5 friends. How many apples did each friend get?