Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

Deon throws a ball into the air. The height, h, of the ball, in meters, at the time t seconds is modeled by the function h(t) = -5t + t + 4. 1. When will the b
In the relationship between number of towers and number of customers proportional? Explain
Modelar con matemáticas Aleyshka está ahorrando dinero en su cerdito. Tiene 15 monedas de 25 centavos, 19 monedas de diez centavos y el resto son monedas de ci
what is the LCM of 4, 5
find a, b and c. don’t be slow. show the equation and answer for all pls (:
how many dogs in the world
Can you draw a free body diagram of this for me?
Perform the calculation then round to the appropriate number of significant digits. 128.5 x 3.24
Terra data cycle experiment the beginning temperature for saltwater solution was -2°C by the end of the experiment a solution temperature was 24°C what was the
The slope of the line whose equation is 2x + 5y + 1 = 0 is0-2750-1/5O5/2