Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

What is the value of x? A) x = 32 B) x = 36 C) x = 37 D) x = 40
USING THE 5 VOCABULARY WORDS BELOW WRITE A MINIMUM 3 PARAGRAPH ESSAY.ENCROACHEXTRICATECONSTRICTCOMPLYTENTATIVE
Can someone help me solve this problem, please!
Without using a calculator, find the integers a and b such that (a/√3+1 )+ (b/√3-1)= √3 - 3
how would price fixing and collusion help producers
what compound has a formula of c5h12o and a broad ir peak at 3300 cm–1?
What is the GCF of x² and x⁹?​
Explain the difference between -✅1 and ✅1
Taking the media into consideration, what can affect a person's mental health?​
write the general form of the equation of a line that is parallel to the given line and passes through the given point. y= -1/3x+2 (-4,0)