bpnachaul97 bpnachaul97
  • 03-12-2021
  • Mathematics
contestada

if 2 man and 3 boys can do a piece of work in 8 days then how long do 3 man and 4 boys take to do the same work

Respuesta :

annambailey1133
annambailey1133 annambailey1133
  • 03-12-2021

Answer:

hope this helps

Step-by-step explanation:

We will solve it by this way-

2 m and 3 b can do a work in 8 days.

Then 3 m and 4 b do it in how many days.

=2*3*8=3*4*x

x=2*3*8/3*4

x=2*8/4

x=2*2

x=4 days

Answer Link
CannatiSmirk
CannatiSmirk CannatiSmirk
  • 03-12-2021

Answer:

Send Them to me I'll figure it out Once They finish the job

Answer Link

Otras preguntas

Were the Wichita nomadic?
What does a rain forest smell like
how many pairs of whole numbers have a sum of 40?
One purpose of the Marshall Plan of 1948 was to (A) rebuild European economies to make communism less appealing (B) aid the depressed agricultural economies of
The thunderbolt bobsled team is training for Olympic Gold. During practice they start a run with a speed of 0.57 m/s, they complete the 1360 m run in 89.49 seco
what is 3,256,423,865 rounded to the nearest million?
What is a number called frontwards and backward like 959
what is 3/4 times 1/2 and what is 1.5 times 0.75 and then i need to figure out how much bigger the answer is to 1.5 times 0.75 is to 3/4 times 1/2
what is 33 %of what number is 1.45
what does a ballad consist of?