maddiebraverman5481 maddiebraverman5481
  • 04-01-2022
  • SAT
contestada

If 24 electricians can wire some new houses in 15 days, how many electricians would be required to do the job in 12 days?.

Respuesta :

shishirshrestha989
shishirshrestha989 shishirshrestha989
  • 04-01-2022

Answer:

here,

electrician/days

24 - 15

x(let). -12

direct proportion,

then,

exchange X up 24 down

or,24*15=12*X

or,24*15divided by 12=X

X=30

hence,30 electrician required to do complete in 12 days

Answer Link

Otras preguntas

An electric vehicle starts from rest and accelerates at a rate of 2.3 m/s2 in a straight line until it reaches a speed of 18 m/s. The vehicle then slows at a co
9) A rectangular pencil box has internal dimensions of 2 cm by 4 cm by 9 cm. What is the length, to the nearest centimeter, of the longest pencil that will fit
whom does peter have more conflict with and why in the diary of anne frank
Please answer URGENT DUE IN TWO MINUTES WILL MARK BRAINLIEST
The author's main purpose in this excerpt is to show that few survived the horrific train ride. the author and his father were safe. Meir Katz was not as strong
please help me with this
Squirrels and other small mammals near Arizona's Grand Canyon are shown to have experienced speciation. Two populations of antelope squirrels that were original
what is the value of x? enter your answer in the box
Steve has estimated the cash inflows and outflows for his dental firm for next year. The report that he has prepared summarizing these cash flows is called a: A
Ifn is an odd integer that is less than -3.25, what is the greatest possible value of n?