ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

Find the value of each of the following:(i)3.5 – 1.4 + 2.9​
During an overhead squat assessment a client's knees move inward. Which of the following exercises is the most appropriate to strenghten and activate the client
The principle of joint operations designed to limit collateral damage and prevent the unnecessary use of force is:_______a. Legitimacy b. Patience c. Perseveran
A 1.00-kg sample of steam at 100.0 °C condenses to water at 100.0 °C. What is the entropy change of the sample if the latent heat of vaporization of water is 2.
2. According to research, what is the most reliable form of identifying potentially effective reinforcers?
A large person and a small person wish to parachute at equal terminal velocities. The larger person will have toa)Jump first from the planeb)Pull upward on the
ωωωωωωωωωωωωωωωωω WILL GIVE BRAINLIESTEET Given: ∆ABC, AB = 45 AC = CB = 34 Find: m∠B
What is the result when the government spends more than it takes in?
Because water has a higher specific heat then land, it what?
The capability needs for a new software-intensive telecommunicationssystem are well understood, but funding is not available to meet all thecapabilities at once