Project metadata is data that is ________.

Respuesta :

kphung76127
kphung76127 kphung76127
  • 04-08-2017
That is the data used to manage the project (tasks, schedules, etc.).
Answer Link

Otras preguntas

select the functions from the following list that could belong to an adt. (hint: ask yourself if these methods belong in an idealistic adt, i.e. one truly meeti
What exactly are manners?
what would be the final concentration if you added the two 2 l of distilled water to the 0.5 l of 12 m kcl?
mr. josh kenney, a u.s. citizen and resident of vermont, owns 100 percent of the stock of jk services, which is incorporated under vermont law and conducts busi
ILL GIVE BRAINIEST Write the equation of the line in point-slope form using the indicated point. The equation of the line is
where are the formal powers of congress listed? list 8 of them
20 points please help What is the name of the ray shown? A. ga B. ag C. ag D. ga
George was solving the equation (2x-1)(x+3)=4 and he got the solution x=1/2 and x=-3. Jeffrey came along and said, "You made a big mistake! You set each factor
If the length of the pendulum in pendulum clock increases by 0.1 % , then the error in time per day isa) 86.4sb) 4.32sc) 43.2sd) 8.64sJEE Mains 2022​
30 POINTS PLEASE HELP which option is a sign that an experiment would benefit from a redesign? The experiment contained control groups. The hypothesis is suppor